Skip to content

Categories:

The Concept for the Project

The principle elements for the concept design include:

  • Utilise existing SH1 interchanges (Drury & Ramarama) for new northsouth arterial connections.
  • Build on existing linear landscape elements (SH1, stream corridors, roads and Hunua foothills) to establish series of landscape ‘veils’ across the site.
  • Incorporate stormwater treatment and control elements within the open space network.
  • Comprehensive approach to site development and infrastructure (stormwater, roads, edge conditions, open space).
  • Establish significant riparian corridor along Hingaia and Maketu streams.
  • Landscaped edge to SH1.
  • Promote linkages to proposed Drury rail station Park and Ride and passive recreation.
  • Use natural topography to reinforce landscape buffer treatment (northern escarpment, Hunua foothills and Bombay foothills).
  • Rationalise and improve existing quarry truck routes. Develop efficient internal road network.
  • Graduate uses across site to protect quarry activities and facilitate desirable landuse relationships.
  • Use riparian enhancement to achieve ecological, recreation and cultural connectivity (reflect traditional pathways).

illust_plan_020810